As the overnight snow fall has continued throughout the day, we still have been able to receive deliveries of material.
Today we were still able to take delivery on materials that are needed for the construction of the practice area. The materials were bunker sand and additional pea gravel for drainage.
In all likely hood work over the next two days will be limited due to the snow initially and then the muddy mess that will be created as melting takes place. Most of the work that will be taking place will be done by hand in areas that required minimal disturbance in the first place.
Wednesday, October 21, 2009
Not a Complete Washout
Posted by Unknown at 2:38 PM
Labels: Driving Range, Renovation and Construction, Weather