Today drainage work on the tee pad began, which will put us closer to the completion of the project.
The tee itself has 1% surface drainage, but additional internal drainage is also being installed to ensure that ideal conditions are present for turf growth. A modified internal herringbone is being installed at a 20 foot spacing making excessive water removal quick and easy.
Following the installation of the drainage system the rootzone mix will be added to the tee surface to a depth of 6". After that time the rootzone mix will be laser leveled creating a perfectly smooth surface for the sod to be layed on.
Drain outfalls being dug
Lateral drain installation
Tuesday, October 20, 2009
Drainage
Posted by Unknown at 4:16 PM
Labels: Drainage, Driving Range, Renovation and Construction
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment