The day has finally come where we have begun to install the new sprinkler heads.
Systematically on each of the first three holes, heads will be installed starting at the green moving backwards through the hole.
As the new heads are installed, each of these new loops will become active and effectively begin the end to the old system as we know it.
At this time the new heads can only be run from the satellite controllers in the field, because the new communication line has not made it to the maintenance facility. This will not occur until the mainline installation reaches the twelfth hole and the communication line can be connected to the central computer found in my office.
Lateral line being pulled in at putting green
New heads in operation
Tuesday, October 21, 2008
Hallelujah
Posted by Unknown at 6:54 AM
Labels: Irrigation Renovation