The only reason we could abandon this stretch of pipe is the fact that the new mainline has been recently installed on the same hole and a cross connection can be utilized. This cross connection will feed into the old mainline and allow us to get water to this portion of the golf course. One of the biggest challenges in this project has been keeping both old and new systems working by a series of cross connections and in this case we would be out of luck if the cross connection did not exist.
Digging on #16 side of the Road
Digging on #17 side of the road
Installing the end cap on the pipe